TAILIEUCHUNG - Study on seismic performance of new precast post tensioned beam column connection (part 2)

Study on seismic performance of new precast post tensioned beam column connection (part 2) presents experimental results of three precast prestressed concrete beam-column connection specimens which were tested at Structural Laboratory of Yokohama National University, Japan. The aim of the experiment is to prove seismic behavior of this type of connection. | KẾT CẤU – CÔNG NGHỆ XÂY DỰNG STUDY ON SEISMIC PERFORMANCE OF NEW PRECAST POST-TENSIONED BEAM-COLUMN CONNECTION (PART 2) TS. ĐỖ TIẾN THỊNH Viện KHCN Xây dựng . KUSUNOKI KOICHI Đại học Tokyo Prof. TASAI AKIRA Yokohama National University, Japan Tóm tắt: Bài báo này trình bày kết quả nghiên cứu của 3 mẫu thí nghiệm liên kết dầm – cột biên bê tông cốt thép lắp ghép ứng lực trước được thí nghiệm tại Phòng Thí nghiệm Kết cấu của Đại học Quốc gia Yokohama, Nhật Bản. Mục đích của thí nghiệm nhằm kiểm chứng khả năng chịu động đất của loại liên kết này. Kết quả thí nghiệm cho thấy liên kết dầm - cột không có khóa chống cắt có độ trượt tương đối giữa dầm và cột và biến dạng dư lớn. Các mô hình thí nghiệm có khóa chống cắt có ứng xử rất tốt với biến dạng dư nhỏ, dầm gần như không bị trượt so với cột, hư hỏng của các cấu kiện dầm và cột rất ít, khả năng chịu lực tốt. Từ khóa: Khóa chống cắt, ứng lực trước không bám dính, bê tông lắp ghép, liên kết dầm – cột. Abstract: This paper presents experimental results of three precast prestressed concrete beam-column connection specimens which were tested at Structural Laboratory of Yokohama National University, Japan. The aim of the experiment is to prove seismic behavior of this type of connection. The experimental results show that the beam-column connection without shear key has large slip and residual deformation. The beam-column connections with shear key have good seismic behavior with small residual deformation, minor damage of beam and column, and nearly no slip between beam and column. Keywords: shear key, unbonded presstressed, precast concrete, beam-column connection. 1. Introduction From the experimental results of the specimens in the Phase 1(1, 2), it can be seen that the unbonded Tạp chí KHCN Xây dựng – số 3/2017 post-tensioned precast concrete connection with shear bracket has high possibility to apply for long-span office buildings. However, there were still some undesirable behaviour of the specimens

TAILIEUCHUNG - Chia sẻ tài liệu không giới hạn
Địa chỉ : 444 Hoang Hoa Tham, Hanoi, Viet Nam
Website : tailieuchung.com
Email : tailieuchung20@gmail.com
Tailieuchung.com là thư viện tài liệu trực tuyến, nơi chia sẽ trao đổi hàng triệu tài liệu như luận văn đồ án, sách, giáo trình, đề thi.
Chúng tôi không chịu trách nhiệm liên quan đến các vấn đề bản quyền nội dung tài liệu được thành viên tự nguyện đăng tải lên, nếu phát hiện thấy tài liệu xấu hoặc tài liệu có bản quyền xin hãy email cho chúng tôi.
Đã phát hiện trình chặn quảng cáo AdBlock
Trang web này phụ thuộc vào doanh thu từ số lần hiển thị quảng cáo để tồn tại. Vui lòng tắt trình chặn quảng cáo của bạn hoặc tạm dừng tính năng chặn quảng cáo cho trang web này.