Đang chuẩn bị nút TẢI XUỐNG, xin hãy chờ
Tải xuống
An empty desert creek overflows in an instant from distant, sudden summer rains. .Materials Madelinetosh Vintage 100% Superwash Merino Wool 200 yards/182 meters per 100g skein 420 yards total Shown in Baltic Gauge: 20 stitches over 20 rows in garter equals 4x4” unblocked. 1 US 8/5mm circular needle 42” or longer Tapestry needle T-pins Stitch markers | An empty desert creek overflows in an instant from distant sudden summer rains. Arroyo by Sarah H. Wolf Materials Madelinetosh Vintage 100 Superwash Merino Wool 200 yards 182 meters per 100g skein 420 yards total Shown in Baltic Gauge 20 stitches over 20 rows in garter equals 4x4 unblocked. 1 US 8 5mm circular needle 42 or longer Tapestry needle T-pins Stitch markers Content 2011 by Sarah H. Wolf Photos 2011 by Adam C. Wolf All rights reserved. For personal non-commercial use only please do not sell items made from this pattern nor teach classes based on it without my express written permission. Directions Using long-tail method cast on 241 stitches. Purl one row. Work lace chart as directed. Note Odd rows are purled with the first stitch slipped purlwise. Setting up shaping Row 1 Knit 125 stitches turn work. Row 2 Knit 9 stitches k2 tog k3 turn work. Short row shaping Row 3 Knit to last stitch before turn k2 together k3 turn work. Continue shaping to ends of shawl. Bind off using Jeny s Surprisingly Stretchy Bind-Off. Block piece to 60 pinning the edges first the center point next and then working outwards. Arroyo was blocked with less emphasis on the points for a more aquatic feel. FAQs and other things How much yarn does this really take Theoretically Arroyo runs about 400 yards however it requires being stingy with the cast on and unraveling the swatch. When I was knitting the prototype I whipped up two different gauge swatches and got fancy with the cast-on which left me a half row from finishing and no yarn. There was an anxious wait for the UPS dude to bring me more so be sure to have extra on hand. There are extra stitches at the end of the row and I want to finish. Now what K2 together and bind-off. How long did this take you Six days from cast-on to blocking. I have questions How can I reach you http .