TAILIEUCHUNG - INTERNATIONAL ENERGY CONSERVATION CODE phần 5

hơn 0,3 cfm mỗi foot vuông (1,5 L / s / m 2), và cửa ra vào đong đưa không hơn 0,5 cfm mỗi foot vuông (2,6 L / s / m 2), khi được thử nghiệm theo NFRC 400 hoặc AAMA / WDMAI CSA 101 / bởi một phòng thí nghiệm được công nhận độc lập, và được liệt kê và dán nhãn của nhà sản xuất. | RESIDENTIAL ENERGY EFFICIENCY 2. Site-built windows doors and skylights. 3. Openings between window and door assemblies and their respective jambs and framing. 4. Utility penetrations. 5. Dropped ceilings or chases adjacent to the thermal envelope. 6. Knee walls. 7. Walls and ceilings separating a garage from conditioned spaces. 8. Behind tubs and showers on exterior walls. 9. Common walls between dwelling units. 10. Attic access openings. 11. Rim joistjunction. 12. Other sources of infiltration. Air sealing and insulation. Building envelope air tightness and insulation installation shall be demonstrated to comply with one of the following options given by Section or Testing option. Building envelope tightness and insulation installation shall be considered acceptable when tested air leakage is less than seven air changes per hour ACH when tested with a blower door at a pressure psf 50 Pa . Testing shall occur after rough in and after installation of penetrations of the building envelope including penetrations for utilities plumbing electrical ventilation and combustion appliances. During testing 1. Exterior windows and doors fireplace and stove doors shall be closed but not sealed 2. Dampers shall be closed but not sealed including exhaust intake makeup air backdraft and flue dampers 3. Interior doors shall be open 4. Exterior openings for continuous ventilation systems and heat recovery ventilators shall be closed and sealed 5. Heating and cooling system s shall be turned off 6. HVAC ducts shall not be sealed and 7. Supply and return registers shall not be sealed. Visual inspection option. Building envelope tightness and insulation installation shall be considered acceptable when the items listed in Table applicable to the method of construction are field verified. Where required by the code official an approved party independent from the installer of the insulation shall inspect the air barrier and .

TỪ KHÓA LIÊN QUAN
TAILIEUCHUNG - Chia sẻ tài liệu không giới hạn
Địa chỉ : 444 Hoang Hoa Tham, Hanoi, Viet Nam
Website : tailieuchung.com
Email : tailieuchung20@gmail.com
Tailieuchung.com là thư viện tài liệu trực tuyến, nơi chia sẽ trao đổi hàng triệu tài liệu như luận văn đồ án, sách, giáo trình, đề thi.
Chúng tôi không chịu trách nhiệm liên quan đến các vấn đề bản quyền nội dung tài liệu được thành viên tự nguyện đăng tải lên, nếu phát hiện thấy tài liệu xấu hoặc tài liệu có bản quyền xin hãy email cho chúng tôi.
Đã phát hiện trình chặn quảng cáo AdBlock
Trang web này phụ thuộc vào doanh thu từ số lần hiển thị quảng cáo để tồn tại. Vui lòng tắt trình chặn quảng cáo của bạn hoặc tạm dừng tính năng chặn quảng cáo cho trang web này.