TAILIEUCHUNG - Infrastructure Improves Data

Centrelink is an Australian government agency, delivering a range of services to the community, and operating two main data centers in Canberra. The company concluded that maintenance of the current cabling infrastructure supporting each data center posed an ongoing operational risk. To improve reliability and reduce operating expenses, Centrelink committed to upgrading the cabling system. | Infrastructure Improves Data Center Reliability and Performance Situation Centrelink is an Australian government agency delivering a range of services to the community and operating two main data centers in Canberra. The company concluded that maintenance of the current cabling infrastructure supporting each data center posed an ongoing operational risk. To improve reliability and reduce operating expenses Centrelink committed to upgrading the cabling system. With the current cabling system moves adds and changes were time-consuming disruptive and expensive. Cabling under raised flooring was so poorly routed and managed that moving one cable often disturbed 100 cables. The only viable solution was to cut cables drag them out and reinstall new cable work that usually required bids from cabling contractors due to the unworkable tangle of copper and fiber cables under the floor. As a result routine rearrangements or adding new servers was difficult and time-consuming. A focus of the project was to create a cabling system that improved reliability reduced costs and shortened intervals for moves adds and changes. Solution The new cabling system for the Centrelink data center pairs 10 high-density NGF Next Generation Frame fiber distribution frames with over 100 FL2000 fiber termination panels mounted in frames and under raised flooring each FL2000 serving as an interconnect for servers in the data center. In the past adding a new server required one to three weeks of work establishing long cable runs through an unmanageable cabling system to directly link equipment. Because the FL2000 panels Technicians mount FL2000 fiber termination panels flush under the raised floor providing interconnect access for adding removing and rearranging servers. and the NGFs were precabled to each other during installation new servers are now brought on line in just hours by merely plugging into the data center network through the FL2000s and moving or adding patch cords at the NGF to .

TỪ KHÓA LIÊN QUAN
TAILIEUCHUNG - Chia sẻ tài liệu không giới hạn
Địa chỉ : 444 Hoang Hoa Tham, Hanoi, Viet Nam
Website : tailieuchung.com
Email : tailieuchung20@gmail.com
Tailieuchung.com là thư viện tài liệu trực tuyến, nơi chia sẽ trao đổi hàng triệu tài liệu như luận văn đồ án, sách, giáo trình, đề thi.
Chúng tôi không chịu trách nhiệm liên quan đến các vấn đề bản quyền nội dung tài liệu được thành viên tự nguyện đăng tải lên, nếu phát hiện thấy tài liệu xấu hoặc tài liệu có bản quyền xin hãy email cho chúng tôi.
Đã phát hiện trình chặn quảng cáo AdBlock
Trang web này phụ thuộc vào doanh thu từ số lần hiển thị quảng cáo để tồn tại. Vui lòng tắt trình chặn quảng cáo của bạn hoặc tạm dừng tính năng chặn quảng cáo cho trang web này.